We have 12 Nos 450T/h Doosan HRSGs installed at 2700 MW capacity CCGT.
After commissioning, EPC have not provided us any HMBD documents for HRSG.
We have found multiple erection defects in our HRSGs, and with the help of HMBD i want to prove that these erection defects (bypasses, insulation...