Some other suggestions have been to break up the existing floor and then to install the dual circuit heater tape, vapour seal, insulation and cast a new floor....?
Does any one know of a more economical solution???
Hi,
Wondering if someone could offer some advice!?
I am working on a project to convert an existing buidling into a freezer store to operate at -25 deg C/ -13 deg F.
The floor of the original building was not designed to prevent frost heave.
What measures can be taken to prevent frost heave...