Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: hemiv
  • Order by date
  1. hemiv

    Options for attaching checker floor plate to HSS beams

    Thanks for the options, everyone. It is very helpful! I'll have a talk with the client to see what kind of performance they are looking for. All else being equal, I like the screw option. Thanks for the detail HTURKAK!
  2. hemiv

    Options for attaching checker floor plate to HSS beams

    I didn’t realize self-tapping screws were an option for this thick of material. The decking is min 1/4” and the HSS is 5/16”. I’ll certainly do that if it’s an option. What about “sidelaps,” as in fluted metal decking? Does this get spec’d or is the plate typically cut for bearing on all edges?
  3. hemiv

    Options for attaching checker floor plate to HSS beams

    I have inherited a project where 5/16" HSS is being used for an industrial platform which will be decked in checker plate. The HSS is already purchased. The previous designer had the floor plate field welded to HSS in overhead position. This is a hell of a lot of overhead welding, and think...
  4. hemiv

    Existing Slab w/ new basement retaining wall addition

    You will want to account for the weight of the slab and live loads on the slab, as well as reactions of any footings near the wall. Check out the California Trenching and Shoring Manual for a good reference on how surcharge and live loads affect soil pressures. And check in your foundation...
  5. hemiv

    Min reinforcement steel in foundation for self erecting crane

    I worked for a large heavy civil contractor, and we would, as a rule, take advantage of the temporary nature of our projects. We made use of ASCE 37. I am not familiar with Eurocode. If the foundation works for the loads, and if the As min is just there for crack control, and if you can live...
  6. hemiv

    Steel Beam to Wood Post Connection

    The end plate is cheap. I would specify it regardless. I would also prefer to connect directly to the post, but I agree for light loads it probably doesn't make much difference.
  7. hemiv

    Sawcut control joints in formed concrete?

    I agree. The point is that it is very hard to get this pool of contractors to look at the drawings and specs, and then not cuss you down the road if they finally do. And I find it's a crapshoot if the homeowner will notice or care. For non-life safety issues, I end up feeling like I'm talking...
  8. hemiv

    Sawcut control joints in formed concrete?

    Thanks, those are my thoughts. This is a residential project, and in my rural area these home contractors just don’t know what to do with a set of plans and specs.
  9. hemiv

    Sawcut control joints in formed concrete?

    I've got a contractor that may not have placed control joint strips in his forms for a cantilever retaining wall... I don't believe I've had this issue before. Can joints be cut in after forms are removed in 2-3 days? I'm only familiar with slabs, and they of course get cut very soon after pour.
  10. hemiv

    One Drive - Am I the Last Person Using Dropbox for Business

    I feel the same. I also use Protonmail for email for that reason, as well. End-to-end encryption is a basic requirement!
  11. hemiv

    One Drive - Am I the Last Person Using Dropbox for Business

    Dropbox has had some security issues, so I switched to Sync.com. One architect I know uses Google Drive. The rest seem to use One Drive. IMO - this is less about One Drive being good as it is about it being conveniently bundled with your Microsoft subscription (or hosting).
  12. hemiv

    Truss Question - Sanity Check

    I don't see any problem. Trusses often have idealized pins at the web-chord nodes, anyway! Should be good as long as the forces can be transferred through your connections, which may need to be strengthened a bit beyond a typical clip or shear tab.
  13. hemiv

    Shou Sugi Ban procedure

    I've encountered it in the timber framing world - you may find some more information through the Timber Framers Guild.
  14. hemiv

    Combined Wood and Steel Moment Frame

    I am working on an existing structure from the 80's which used steel tube columns and doubled light wood trusses designed for end moments. The columns have big flag plates welded to the top, and the top and bottom chords of the trusses are bolted to it. We have to modify this structure. We are...
  15. hemiv

    Firm Principals and Liability

    Thanks all. The insight is helpful. Yes, for clarification this is a multi-disciplinary firm and I am the structural guy.
  16. hemiv

    Firm Principals and Liability

    Is it possible for principals of a firm to be considered liable for errors or unethical activity of another principal? I’ve got a situation where I believe a principal is practicing outside of his expertise (and encroaching on mine). On the one hand, surely he is solely responsible since he is...
  17. hemiv

    Big Light Poles - UL Certification vs Structural Design

    msl - Yes, that's what we have in hand. Although it's deficient - no mention of seismic loads. brent - That's great to know, thanks for sharing. The SE we have on the foundation is from Iowa, so probably the same firm. Musco did tell me today that they are looking to get a me "calculations," so...
  18. hemiv

    Big Light Poles - UL Certification vs Structural Design

    msl - Your experience is similar to mine. I was expecting a few pages of shop drawings with details, design notes, reactions, and a stamp. My understanding of the UL is the same, more about broad conformance to electrical codes rather than specification conformance to site-specific design...
  19. hemiv

    Big Light Poles - UL Certification vs Structural Design

    I've got a project at a sports field which includes some 70' - 80' light poles. The electrical engineer spec'd Musco poles, and I have received some submittals from the contractor. In my specs, I asked for stamped pole shop drawings showing that they meet the project design criteria (I assumed...
  20. hemiv

    Code & Structural Alterations

    This is a follow up to a previous post I made about pre-engineered metal building modifications. This building is in SDC D. I am replacing existing rod bracing with a portal frame. The building was built in the 90s. Does the new frame need to meet current seismic detailing requirements? In...

Part and Inventory Search