  1. AlexSTR89

    Modification to Existing Drawings

    Thanks for the reply Rabbit12. If you don't mind me asking, how would you handle the drawing revision - would you insert a new title block for your company around the existing drawing, would you clip out the old title block, or would you just update the original title block with latest revision...
  2. AlexSTR89

    Modification to Existing Drawings

    Hello, I am curious on what the usual procedure is to making minor modifications to existing buildings. For example making a new wall opening - the city usually requests that complete floor plans be submitted for permitting. Is it permissible to draw on top of the existing building drawings? If...
  3. AlexSTR89

    Tie/Grade Beam for Piled Foundation

    I am referring to the reactions along the building length, due to braced bays. Thanks for your input KootK, I will try to follow some similar design methodology. Does anyone know of a good reference that addresses this issue or provides some design examples?
  4. AlexSTR89

    Tie/Grade Beam for Piled Foundation

    Hello, I am designing a piled building foundation for a metal building. Currently we have two piles under each column (aligned perpendicular to building wall), with pile caps and concrete piers. We are using a perimeter grade beam to tie the pile caps and piers together, and distribute column...