cvg, you're absolutely correct. The detention box is used to allow sediment to settle out of the storm water, prior to discharge through a pipe.
I want to know if the pipes in the system can serve that Purpose, and if it is a good practice.
Is it possible to achieve 90seconds detention for storm water quality in a storm drainage system's pipes instead of using a detention box? Is this a good practice?