valleytank: Is this requirement per API 650? I know the ASME VIII code requires them to be staggered but I can't find a requirement in the API 650 code.
Per API 650, does the shell long seam have to be staggered from one plate to another or could be welded as a continuous weld from top to bottom of the tank?