I appreciate your inputs all.
goahead, my pipe supports do not interfare with fluids inside pipes. but it is a requirement that there should be a minimum of 5ft between any welding operation and a live pipe. and the facility is such that one cannot guarantee that space.
Bolted connections too...
I am working on a project that require adding some pipe supports for 2" and 4" pipes to an existing offshore facility(Platform). we designed 100% welded connections (both shop welds and field welds). The client is asking for an alternative connection system, so as to avoid or optimise shutdown...