  1. DCMV

    When performing weave technique on

    When performing weave technique on pipe weld per the WPS is there a code specific on max of how wide the weave can be in a single pass using GTAW process? I can not find in any ASME or API code. I would think that as long as you keep your machine settings in the parameters of the WPS, it...
  2. DCMV

    We are splicing column to top of ex

    The column being spliced for additional height on a existing pipe rack. That will have load beans added for additional pipe.
  3. DCMV

    We are splicing column to top of ex

    We are splicing column to top of existing column full pin welds what type of load would that beregarding RT acceptacne criteria per D1.1. The column have a flange of .5" and welding with E7018.
  4. DCMV

    Structural welding

    when welding structural beams to existing structure such as pipe rack will ASME sect 9 WPS and PQR be acceptable or is AWS WPS have to be used. In Texas.
  5. DCMV

    New ASME editions

    Per the NBIC page below Texas stated current edition, having said that when did 2015 edition come out. If I annoy mistaking new edition are issued in January or June. So as Mike mentioned should it be implemented 6 months from date issued? Construction: ASME Code (Current Edition), Sections I...
  6. DCMV

    New ASME editions

    The latest ASME edition is 2015. We have a shop using 2013 edition. When should the 2015 ASME Sect VIII be implemented.
  7. DCMV

    F#

    Why does ER70S-6 not have A # assigned?
  8. DCMV

    F#

    Hello, I need some help understanding filler metal change on WPS from what I understand if you stay within the same F# on WPS you would not need a new WPS. Example, changing filler metal from ER70S-2 to ER70S-6 on a WPS the F# is the same but the A number is not. Per ASME would this be allowed...
  9. DCMV

    Jurisdiction

    I'm sorry we are will be adding a new dock at a refinery in orange Texas. We will drive in pipe pilings to water floor and tie in with structure beams.
  10. DCMV

    Jurisdiction

    What Jurisdiction whould driving piling for Dock plateform, what code would the piling be under and what code would the structure be covered under.
  11. DCMV

    Multiply Repair Organization

    We had contractor A start replacing some tubes on a Steam boiler, contractor A did not finish the repairs (had to leave plant unexpectedly) and a sister company of contractor A with their own R stamp is going to complete the tube replacement. My questions are how should that be handled as far as...
  12. DCMV

    Hardness Testing

    We are building a carbon steel pipe spool piece that requires elavated preheat in lieu of PWHT, with required preheat tempature of 350 degrees and Hardness testing with max reading of 200, I would like to know if the BNH readings have to be complete on all the welds including the shoe to pipe...
  13. DCMV

    PQR

    I guess my question is can a PQR have base metal thickness of 1.5 without PWHT and still be in the ASME SECT IX requirement?
  14. DCMV

    PQR

    Got a question to clarify when PWHT is required. B3.3 requires pwht for material over .750", so can a PQR per ASME sect IX have been done on a plate 1.5" thk. Without pwht and can a WPS use this PQR for a max thk of 8" without PWHT.
  15. DCMV

    NBIC

    Is there a requirement per NBIC on facsimile/rub of the original data plate to be in the code package after completing a coded vessel repair.
  16. DCMV

    bolts/nuts

    Is there any asme code that specifies which way the nut has to be on a bolt, is there such thing as a backword/upside down nut? I know the material/grade should be showing when checking a bolt up connection. I'm just wondering if 1 nut out of 45 is backword (not showing 2H) is this good reason...
  17. DCMV

    WPQ

    I understand that Backing is an essential variable and the GTAW root pass is considered backing for the SMAW, but I don't understand why the statement would be made in QW-306. QW-306 COMBINATION OF WELDING PROCESSES: A welder or welding operator qualified in combination on a single test coupon...
  18. DCMV

    WPQ

    I need help to understand the statement made in ASME Sect IX it basically states that If a welder or welding operator qualifies in combination on a single test coupon the welder can weld in production any of his single processes or combination of his processes. So if he completed a 2" sch160 in...
  19. DCMV

    Grinding after hydro

    The vessel will be rubber lined, having said that the hydro test has to be complete prior to the application of the lining. The tuber lining procedure has surface prep requirements of rounding nozzle openings to 6mm and smoothing out weld reinforcement.
  20. DCMV

    Grinding after hydro

    That's my question what is considered weld end preparation? The drawing that where revised after call for welds to be flush and edges rounded to 6mm.