Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Ishrit

    Electric Panel & Disconnect Switch-Arc Flash PPE

    Thanks all. So that means installing a fused switch in parallel with the non fused switch is ok and when ever a repair needs to be done on switchgear with doors open, the fused switch will be closed and non fused switch will be open. Based on the current Arc flash analysis, I put a bus to...
  2. Ishrit

    Electric Panel & Disconnect Switch-Arc Flash PPE

    Thanks ZogZog. I have a situation where a switchgear is 600 v and has a 750 kVA dry type transformer and fed from a circuit breaker located far away. The switchgear has a non fused disconnect switch before primary. It has a Cat3 .energy level. The suggestion is to install a current limiting...
  3. Ishrit

    Electric Panel & Disconnect Switch-Arc Flash PPE

    Hi All, I did some research on this site looking some basic answers but could not get to the bottom of my dilemma. In case of a 600V/480 V fused disconnect switch or an electric panel(240 V fed from 150 kVA TXF), if we have to just operate these equipment while these are encased and similar...
  4. Ishrit

    Connection Impact Assessment

    Hi Mark, Some how my earlier log-in got blocked or some thing. I was wondering about those studies if I could use as an example. I would appreciate if you could help. Thanks Redfurry, I am in Ontario as well and was wondering if this kind of CIA studies give a good insight from learning...

Part and Inventory Search