Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Power Outage at Heathrow Airport - Realiability and Resilience 1

Jpascp

Electrical
Joined
Jan 15, 2025
Messages
31
Any idea that what could happeded?

Harmonics issue?

No fire resistant concrete walls between power transformers?

Sprinkler system was not operational?

No redundancy?

Others?
 
This is partly covered in the disaster forum?

There were no fire walls and no sprinkler system (not sure that would be a good thing with 275kV flying around)

There was redundancy to a certain extent but the fire took it out.

Heathrow had three main feeds, but two of the main terminals were mainly on one supply and switching over required power down and no one was sure if the other two could cope with a full load and they didn't want it to trip in the middle of the day.

why it caught fire in the first place? Don't know and haven't seen anything other than the TXs were pretty ancient.
 
According NESO (UK TSO):

NESO will submit an initial report to the Secretary of State and Ofgem within 6 weeks, with an initial assessment of the data available at this stage of the review.

NESO will provide a final report to the Secretary of State and Ofgem by end of June 2025, which will include recommendations and lessons for the future and where possible, a proposed implementation plan.

Key findings and recommendations of the review will be published by NESO.
 

Part and Inventory Search

Sponsor

Back
Top