    Equipment Cost estimation ( for pumps installed in parallel)

    Dear all, I was given a task to review a feasibility study which is an irrigation project. The consultant used to estimate the cost of pumps to be installed as follows C =(P*n)^0.55 *k Where C cost of pump and motor in USD p = nominal power of motor(kw) which is the standardized...