Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

XR250's latest activity

  • XR250
    XR250 replied to the thread Whats the deal with hip roofs.
    Many of the incestuous engineers around here will just call out a double rafter on each side of the hip peak in an effort to "brace" it...
  • XR250
    XR250 replied to the thread Easy foundation work or a trap?.
    Same here
  • XR250
    XR250 replied to the thread How to fix this?.
    KootK the G.O.A.T.
  • XR250
    XR250 replied to the thread Steel Beam to Wood Post Connection.
    This.
  • XR250
    XR250 replied to the thread Steel Beam to Wood Post Connection.
    Honestly, in my area, I have seen a flush residential steel beam fastened to wood support maybe 2 times in the last 30 years.
  • XR250
    XR250 reacted to Eng16080's post in the thread HOT TUB - gut check with Like Like.
    The detail specifics would depend on OPs conditions, although I wouldn't be relying only on friction. I was picturing a web nailer...
  • XR250
    XR250 replied to the thread HOT TUB - gut check.
    Would you be relying on friction only or would you have a nailer bolted to the bottom flange?
  • XR250
    XR250 replied to the thread HOT TUB - gut check.
    We still don't know if this is a one-sided connection to the beam or not. If it is, I'd be packing out the beam and using hangers to...
  • XR250
    XR250 replied to the thread lag bolt in middle of two ply 2x4.
    I doubt you will find anyone to be on board with this. Although, this is how 4x4 knee-brace connections to deck beams are done in my area.
  • XR250
    XR250 reacted to jerseyshore's post in the thread Easy foundation work or a trap? with Like Like.
    Helical piles w/ underpinning brackets onto notched footings get the load as close as possible to concentric for retrofit conditions...
  • XR250
    XR250 replied to the thread Easy foundation work or a trap?.
    For better or worse, I do a fair amount of these. The AHJ requires an engineer design and "sign off" post construction. It is basically...
  • XR250
    You can have them install flashing and weeps above the roof line.
  • XR250
    XR250 replied to the thread HOT TUB - gut check.
    I'd be more concerned about the eccentric load on the beam if there is any.
  • XR250
    XR250 replied to the thread TJI Issue.
    Fair enough although I don't think I ever said there was a problem with the floor. I usually set a hard limit of L/240 total load & 360...
  • XR250
    XR250 replied to the thread Steel Beam to Wood Post Connection.
    For me, I would have no attachment to the post and use studs instead of PSL for only 4K. The floor diaphragm will keep it in place.