I typically assume a flowing full condition when setting the slopes of the sewer. In reality, it may be hard to ge a full 3 fps. This is usually the case in the upstream pipes that may have a small tributary area but are being installed to pick up a designed low spot. I never use less than a 12"...
I am designing a wetland style pond and need to keep the total water inundation time under 72 hours during a 100 year event in order to not kill the plants. The site is about 10 acres and the pond is only about 2-2.5' deep. Using TR-20 with a Huff rainfall distribution, my total time is over 80...
I am designing a parking lot and the contractor wants to use recycled asphalt. What are the negatives to using this? I assume that the parking lot may not last as long but are their any other concerns? If it matters, I live in the midwest with some pretty cold winters.
I have read that the Time Interval needs to be less than 20% the time to peak. Is this correct? If so, I assume that means 20% of the time to peak of the Unit Hydrograph. Can anyone confirm my statement?
Well, I agree with the constraints that you mentioned. However, I feel that it is good in estimating the required volume that you will need. After that you can design your pond as necessary and import the design contours into the pond function to get the exact design. Otherwise you have to guess...
I do agree that sometimes we are better off to require a cash donation to improve or develop regional detention basins instead of having numerous small basins with unmaintainable restrictor sizes.