eschwarzrock,
I have no idea why my response to your input did not show up. So, I'll try it again!
The base material is placed sans a geotextile. I questioned a couple of the general contractors that I work for regarding the use of a geotextile and both only required it when placing a...
Most often I've seen the control joints being cut early the following morning of a pour.
My calculations put me close to 18 yards which is far to much to attempt at one shot for "my crew." I certainly would prefer to be able to do a continuous and dice it all up the next morning...
Thanks jheidt2543 for your input! Control joint caulking is an excellent idea! I initially removed 10" of soil to be able to provide my 5" base and 5" pour. On the first 1/3 of the drive (from the garage floor outward) I've already placed the class 5. I'm wondering in light of...
My questions have to do with the correct preparation of the substrate for a concrete driveway.
I am replacing the asphalt driveway in our recently acquired home. The asphalt was literally coming undone and beginning to leave car tracks!
I live in the Minneapolis, MN area. Upon removal of the...