Thanks to everyone for your contributions. It seems that the orientation is not that important, or at least not likely the cause of the problem. I will follow up with the manufacturer though.
I am Civil/Structural, but as an Owner's representative am involved with all aspects of building design and construction. We have a situation where a vertical in-line pump has been installed in a horizontal position. This is a 1/2 Hp pump that serves a primary boiler loop. The design flow is 48...
This may seem like a basic question, but I would like to get some information on the standard procedures for backfilling bore holes after the completion of the drilling. This is with respect to holes completed for foundation design, which are immediately filled after the test is complete. Are...