Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by vishalmehta

  1. vishalmehta

    Load Shedding Scheme

    One of the load shedding method depending upon loss of generation we have adopted is as follows. The scada system continuously monitors the plant load and the generation. Delta P(mw), a operator settable value is set which is a value of load which system can take in addition to existing load...
  2. vishalmehta

    Automatic Transfer Systems

    I agree with JBD regarding location of voltage sensing PTs to be on line side, which is generally a normal practice. To add on a few more points: 1) ATS should only happen between two incomers incase of "undervoltage". And also a delay of 1 sec is generally given along with...

Part and Inventory Search