Hi Kanif77, for Plan 53A, the seal pot is needed to be consistently pressurized by Nitrogen. If the nitrogen pressure drops, the sealing system would be converted into Plan 52, of which the process fluid will flow into the sealing system and inboard seal faces now become lubricated by the...