Hi everyone, I am working on a hoarding design (approx 100m long), and I have to include an access gate in the centre. I am applying Eurocode 1, section 7.4,.1 (free standing walls and parapets)
I was wondering how others deal with the wind load zones (A,B,C,D) at access points. The normal...