Greenimi,
What I mean by "the second segment is there to meet the requirements for the connector" is that the cutouts require a bilateral tolerance of +/- .005. That is why I added the surface profile of .010.
Chez,
You have me thinking maybe I do need to separate the lower segment. Can you elaborate more, I am confused by your statement? I want to locate the three cutouts .060 relative to the datums in the first segment. The second segment is there to meet the requirements for the connector. I don't...
I have three questions related to the one above.
1. Is the term INDIVIDUALLY applicable to the 1994 standard?
2. For Composite Profile Tolerance, does PLTZF and FRTZF apply in 1994 standard? I didn't see any mentions of PLTZF and FRTZF in section 6.5.9 of 1994.
3. My goal is to locate two...
I was curious how Figure 11-21 on ASME Y14.5-2018 would be interpreted in ASME Y14.5-1994.
I believe the total width in this case at at given point is 60.0 +0.4/-0.8 for 2018. Is this correct and is it true for 1994?
Is the statement below from 2018 true for 1994?
11.4.3.1 When the...
Hello All,
How many part numbers are allowed to be assigned to a Find Number or Item Number? I have attached an example BOM where FN 2 and FN 4 have two part numbers assigned to them. For FN 2 and FN 4, the material may be different for the plate and bracket or they have slightly different...
Hello all,
I'm currently having issues with my drawings when I insert break lines in my model. For some reason the sketches and hatch marks that I inserted near the break line gets transferred onto a different area of the drawing. In this drawing it shifts to the upper right hand corner. In...