Hi,
A bracket is projection welded (R3mm) to a part with a weld pitch of 18mm. I would like to put a 3-sheet 12mm spot weld directly between the two projection welds (slightly offset from the centerline) to bond this assembly to another panel. I realize that due to the small pitch between the...