Our firm, a steel fabricator, was given design drawings which depicted moment frame connections, which referred to a detail (which in plan view was (3) beams coming into a column beam) showing "pictorially" a stiffener to be welded inline with the flange of the beams. We welded stiffeners on...
I am a Project Manager for a Steel Fabricator. Often, there is much incomplete information on design drawings which necessitate field verification, prior to development of shop drawings.
Is the General Contractor responsible to furnish this needed information to the E.O.R. to add to the design...