Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by stevenw

  1. stevenw

    insulation for ducts

    On some jobs we internally insulate the first 25' of duct for sound control then go to external insulation (cost) for the rest of the duct run.
  2. stevenw

    Experience with H2S

    Be sure to specify several flag poles around the property with big flags so you know what direction is downwind. (Run upwind). We do that at oil refineries. Don't forget some SCBA packs and OSHA warning signs.
  3. stevenw

    LEED information on drawings.

    We are about to start a LEED project (MEP). We are planning to use a leaf symbol next to LEED items on the drawings. This should help prevent items from getting VE off the job and help the reviewer spot items. What have people done on other project?
  4. stevenw

    hot water expansion pressure calculation

    You might want to test the system after going to 220 F. That is above the temperature limit for some PEX.
  5. stevenw

    Chilled Water Piping Material

    Office rule - No PEX. CPVC is ok. Watch them like a hawk so they don't use PVC.
  6. stevenw

    Revit MEP

    Revit MEP is getting better but it is not up to speed. We can still go faster in autocad. You should go to a Revit MEP training class because you would never figure it out on your own.
  7. stevenw

    3D Model of a SAT Diver

    You could grab a photo of a SAT diver. Cut the rest of the photo out. Xref into Autocad as an OLE. I would also email the commercial diving schools.
  8. stevenw

    solvent store room - air change rate

    I would start with a minimum of six (6) air changes per hour.
  9. stevenw

    Pedestrian Tunnel

    We did a sky bridge between two buildings. It was a glass enclosed walkway two stories above the street. We have to provide 45F to 85F climate control with 15% outside air. We had to provide a smoke exahust fan on the top. 6 air changes per hour. Fully sprinklered with a dry system. The City...
  10. stevenw

    Sulfur dioxide air filtration

    I think you will have to go with a "chemical" filter.
  11. stevenw

    Digital Camera Recommendations for Macro Shots

    Nikon D80 with a 60mm maco lens
  12. stevenw

    Three Way mixing valves

    We specify diverting valves on our projects. They have given us better cooling coil temperature control than mixing.
  13. stevenw

    Too much ventilation Air

    Yes the barometric dampers at the RTU should be able to vent the relief air. My rule of thumb is 5-10% of the air will be lost thru the construction. You want to leave 10% of the return air in the space for pressurization.
  14. stevenw

    Solar Tint vs Window Screens

    Window screens that block sunlight also block the airflow thru the screen. If you never open the windows, screens have a lower installed cost.
  15. stevenw

    Elevator Machine Rm Ventilation

    imok2 is correct. a ductless split system / heat pump is the way to go.