  1. steve2007

    Is 'U' stamp required for ASME VIII coded vessel used in Australia?

    Thanks bernoullies123. This is understood. One question is that as part of ASME certification of the vessel, does it require to be U-stamped especially pls note the inspection compliance part of U-1A form will not be AI certified. Without this will the WHS accept the documentation for...
  2. steve2007

    Is 'U' stamp required for ASME VIII coded vessel used in Australia?

    Peers, There is confusion in the 'U' stamp requirement of ASME VIII Div 1 coded vessel fabricated overseas (not US), but will be used in the Eastern States of Australia. There are two sides of thoughts/argument which states 'U' stamp is required as part of ASME VIII vessel certification...
  3. steve2007

    A387 Gr 22 Weld Procedure

    This is the provided information about welding ***** Welding procedure: GTAW Filler Material: TGS-2CM Amp: 60-120Amp Pre-heat: More than 150deg C Post heat: After keeping 10min at 300-350deg C, welded portion should be covered with glass cloth and cooled slowly (Temperature should be controlled...
  4. steve2007

    A387 Gr 22 Weld Procedure

    Thanks for your feedback. I know that the question sounds basic stuff. To be more specific, I'm looking for a suitable welding procedure for A387gr22 material for welding the cracks in the turbine exhaust cylinder. We've been using the repair welding procedure supplied by the manufacturer...
  5. steve2007

    A387 Gr 22 Weld Procedure

    What are the specific requirements while preparing a WPS for A387Gr22 material? What are the different consumables used?