All -
Yall have been more than helpful and yes in my calculations I made the assumption that everything is loaded ~100%. From reading the responses I think all would fall coorect w/in the 50-75% range. Thus the Main Construction Transformer would be within it's maximum MVA Rating.
Thanks for...
I am responsible for a Load Analysis Study for Construction Power. I was given the Single Line drawing of the overall construction power and the Size of the Main Construction Transformer.
The Mian construction Transformwer is 18MVA and when I do the calcuations respective 480V Distribution...