I have been told by the inspectors that roof plywood needs to be nailed at the ridge and at the eave blocks to provide a proper "diaphragm". Yet To provide continous ventilation in the rafter bay between the eaves and the opening at the continous ridge vent I cannot install blocking or a ridge...