Thanks to Montemayor, MBeychok and EGTO1 for responding.
Indeed the expansion pipe arrangement (Type B) shown in Pamphlet 60 of the Chlorine Institute is the actual design installed. My task is to connect the expansion pipe to the Derakane vent header (1 bar abs) so the pipe can be emptied. I...
Dear Helper,
I feel like a “fish out of water” after recently transferring from R&D to the Process Engineering department of the company, so thank you for taking the time to respond to my problem. Here it is:
There is a pipe (volume (V1) = 12 liters), which has the potential to be blocked in at...