Hello all,
We're having no luck ramming our ca. 150mm I-section piles into the ground.
As per the Geotech, the ground is very hard with lots of rocks of up to dia. 300mm.
What to do? We've tried pre-drilling with an auger but it seems this method won't achieve the desired results.