I have an existing LVL 14"x3.5" with a span of 18'. Applied moment is 300k-in. The last 6' of the beam has been significantly deteriorated by water damage. It is the contractors desire to leave as much of the existing beam in place as possible due to its situation over HVAC, electrical, etc...