Our Company is just trying MDX to design a continuous 2 span rolled beam bridge, and I am having trouble getting results that I can believe. I have a symmetrical 4 girder line system (Girder Line 1 and Girder Line 4 should have similar results, and Girder Line 2 and 3 should also have similar...