  1. S Nunez

    Residential Slab-on-grade Foundations

    I want to know if there is a maximum spacing for the closed ties on grade beams of residential reinforced slabs. FHA has a maximum spacing of 48" centers. In my experience, I normally use 24' spacing. Is there an actual code requirement for the spacing of rebar ties? S. Nunez, PE
  2. S Nunez

    Minimum foundation height above finished ground for structures

    On 2015IRC 404.1.6 requires for "the foundation to extend above the finished grade a minimum of 4 inches where masonry veneer is used and a minimum to 6 inches elsewhere." But I do not find the equivalent for this requirement on the IBC for non-residential structures. I reviewed 2015 IBC...