    Determining the amount of material sprayed over time

    Sorry for the delay, I've been sick in bed for a week . . . Time refers to the total time spent spraying. As an example: A particular nozzle sprays a footprint 0.5meters in width. The tractor (and thus the nozzle) moves at 3 meters/second. Thus, over a 5 second period, the area sprayed is...
  2. RoyH

    Determining the amount of material sprayed over time

    This may be similar to an agricultural problem I've worked on. The nozzles were rated based on a linear coverage at a certain distance (example, 0.5 meters at a nozzle distance of 1 meter). The area covered is then: Linear Coverage * Nozzle Velocity * Time. Dividing this by the volume of...