send me the horizontal angle (from above )grade in % (pos or neg)to the bend and grad out % (pos or neg)from the bend and i will send you the true angle and roll ,i have a program ,i can also give you the max cut to make this bend and templet layout ,i have looked high and low but havent found...
you must calculate the true angle (*)useing the grade in (A)grade out (B)and horizontal angle (C).
cos*=cos A cos B cos C +(if grade in and grade out has one above horizon and one below horizon)-(if both above or both below horizon ,example grade in -5%grade out +8% or grade in +5% grade...
the manhole will have to have a locking lid ,i have used bolt down casting,if frost heave or flotation is a concern strap the manhole recast vertical sections together.
sometimes the paint will have a small bubble or chip so yes use a file and wire brush on all flange faces before you bolt up ,its a good habbit and dosent take long.they dont have to be totaly cleaned down to the bare metal ,run your hand across the face and if its smooth to touch its good to go.
at one time a platform was required to make it easier for a man to climb in ,a resting point ,stageing area for tools and such and shorten the fall if he did so but now with the confined space requirements the platforms are considered an obsitcal for man retreval from the top .go figure have...
it is set by the turning radius of a fire truck ,call the local fire hall and they will tell you what they want ,they are the ones that set the radius requirements .
you can use a rubber coupling with an adapter that when on the steel pipe matches the od of the conc pipe,its a poor method,very week joint,poor shear strength even if a shear band is used ,or use a construction joint (line them up and form the inside with plywood and pour concrete diaper...
I used a HP calculater with a survey pac years agoe to calculate property line layouts for a proposed subdivision useing the minimum lot area requirements ,that way you can get as many lots as possible out of the subdivision.
a lot of legal survey companies have switched over to total station now and there are some great wild instruments out there that are set up to be used with a mini red (electronic measurement)with a good 2" or 5" transit and mini red a person can layout everything just as fast as a total station...