Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by RORCULLO123

  1. RORCULLO123

    Stress Relief and ASME Code

    metengr Sory, this is not i meant to be...it was my fault to connect this thread at the original post....i suppose to post my thread but accidentally posted at this forum. to tell you franckly, i am just a new member here. Anyway, thank you for valuable response/advice.....
  2. RORCULLO123

    Busted steam check valve of pressur

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  3. RORCULLO123

    Stress Relief and ASME Code

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  4. RORCULLO123

    REFRIGERATION-CHILLER

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  5. RORCULLO123

    REFRIGERATION-CHILLER

    busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  6. RORCULLO123

    REFRIGERATION-CHILLER

    thanks to your valuable reply.... By day the previous design datas and condition written below are as follows; 100 TOR, 95 kw rated compressor power,90 KW compressor power required, 18 bars operating pressure and 658 m3/h swept volume and water cooled... ... and the present/redesign data: 100...
  7. RORCULLO123

    REFRIGERATION-CHILLER

    REFRIGERATION-CHILLER I am a begginer Mechanical/design Engineer.... As of now construction of our rehab chiller is still going on. Some technical says that our compressor will possibly worn-out because that reciprocating compressor use a ammonia refrigerant and my design is use Freon 22 instead...

Part and Inventory Search