I do a ESFR system about once a year, have to review notes, and read up on NFPA 13, it seems like the same water blockage as the leading edge of bar joist requirement. Working with steel Mfg. on our piping locations, and His Min. requirements on wind bracing. His min. distance piping to a joist...