Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by RLabire

  1. RLabire

    Fire Protection system needing connection to two water mains?

    Stookeyfpe you are confusing two issues, this requirement was not eliminated in 2015 IBC. 403.3.1 does require a building over 420' to have two supplies. However 403.3.3 requires any highrise building in Seismic Design Category C, D, E, or F to have a secondary supply.

Part and Inventory Search

Back
Top