  1. REIIC

    90 ft. Auger Cast Piling

    Any concerns over driving timber pile ajacent to ACP or should all timber piles go in first. Cure time will take care of itself if timber piles are installed after ACPs. There are 300 +/- timber piles.
  2. REIIC

    90 ft. Auger Cast Piling

    hokie, Well now I'm back to uncomfortable. We definately have a high ground water table. Drainage ditches all have standing water year round. Install a couple of auger cast piles and load test them. Do they need to cure 28 days? There will be 60 ft. timber piles within 7 ft. of the auger cast...
  3. REIIC

    90 ft. Auger Cast Piling

    Think that's got it guys. Thanks.
  4. REIIC

    90 ft. Auger Cast Piling

    So the cage will have to be pushed into place with hopes its straigh and true before the concrete gets to stiff? I see some problems.
  5. REIIC

    90 ft. Auger Cast Piling

    We have a project in south Louisiana proposing to use 18-inch diam x 90 ft. auger cast piles. I assume the cage will have to be placed after the auger is removed with poor soil conditions we have here. Does this sound possible?