Here in Canada, the code allows you to design down to 1.2 m/s. I would, advice the client that with 1.5 m/s itwould make the pipes bigger, increased capital cost, keep pressure higher than needed in many locations of the system, etc. If they would still want to proceed, then so be it. Usually...