My firm is designing a storage facility for hydrofluosilicic acid used in water treatment. The project manager says the fire alarm pull station should go on the outside wall near the door, but I want to put it inside the building. He says it is a fire code requirement to put it outside the...
We are designing a service entrance to a sewage treatment plant in Souther California. Power from the utility's 2000/2576 kva transformer enters at 480 volts through a 3200 amp main circuit breaker. Back-up power is from a 1500kw diesel generator through a 2500 amp circuit breaker to the main...
I need a commercial load flow computer program to do a study on a sewage treatment plant electrical system. I'm looking for one with graphics capability on Windows platform. If anyone has used one they would recommend, please reply with the name and phone number of the company that sells it.