Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by patigerjet

  1. patigerjet

    Designing High Capacity Inlets above large Storm Interceptor

    I'm working with a fairly large & complex 2.5 mile storm diversion pipe preliminary DESIGN project of twin 42" pipes with storm inlets placed every 300-400' along/above the twin interceptor. The twin interceptor is to be installed just above and parallel a very high stone quarry wall operation...

Part and Inventory Search