    Multiple drainage areas outlet to lake.

    I have one last question. Do I need to add an additional Lake/Reservoir flow segment for each subcatchment area?
  2. orshii

    Multiple drainage areas outlet to lake.

    The direct rainfall on the lake is not my question. I've modeled 3 drainage areas as 3 separate subcatchments. They outlet to the lake in 3 different spots. I have the Tc for each. There is a dam at lake outlet. The runoff from one subcatchment outlets to the lake at the far end away from the...
  3. orshii

    Multiple drainage areas outlet to lake.

    I have 3 drainage areas that outlet to a lake at 3 separate points. How do I model the lake runoff? There is a dam outlet structure at the end of the lake. Thanks,
  4. orshii

    Reservoir routing - hydrological problem

    I have a similar situation with drainage areas and a lake, but I have 3 separate subcatchment areas that outlet to the lake at 3 different points. How can I model the lake runoff through an existing outlet dam with HydroCad? Thanks.
  5. orshii

    Example attachment

    Is it possible to send a PDF file of a "Post Development" drainage area to you for assistance in properly modeling it in Hydrocad. For example, the drainage area has catchbasins and culverts. I can't seem to locate an example of a project done in Hydrocad that would assist me. Orshii
  6. orshii

    2 drainage areas w/culvert

    How do I model 2 subareas linked by a culvert in HYDROCAD? (ex. Subarea A drains into Subarea B through a culvert that crosses a road).
  7. orshii

    2 drainage areas w/culvert

    How do I describe 2 subareas linked by a culvert in HYDROCAD? (ex. Subarea A drains into Subarea B through a culvert that crosses a road).
  8. orshii

    Type II and Type III 24 hour rainfall distributions

    Thanks for your excellent clarification. Orshii
  9. orshii

    Type II and Type III 24 hour rainfall distributions

    My results from using either type II or type III rainfall distributions are coming out the same when I use the Hydrocad program. Is this right or what do I need to do to correct this?
  10. orshii

    Modelling a forebay with hydrocad

    Is there a source for viewable/downloadable projects online that used Hydrocad other than the samples that came with the software that can be used for study?
  11. orshii

    Modelling a forebay with hydrocad

    How do I model a pond with a forebay using hydrocad?