bridgebuster, the wall is stable. The reinforcing in the stretchers are #3 bars. If 3/8" diameter hook bars are anchored in would you have to drill in to the stretcher the full lap splice length of a #3 bar which would be about 18.5"?
I am working on a project that contains an open faced precast concrete crib wall that is need of repair. It is approximately 20 feet tall and was built about 30 years ago. The wall is backfilled with stone approximately 4 to 5 inches in size. The majority of the wall appears to be in good shape...