Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by Nour771

  1. Nour771

    CCE 1"66 plugging

    An oil producer well here in the field has an obstruction in CCE(1"66 conduit into the oil production tubing 4 1/2")this CCE is the means to injection wash water, then it was completely pluuged. Scale Deposits built up at first 100m to surface,Chemicals(corrosion & scale inhibitors) are...

Part and Inventory Search