    CMU Retaining Wall leaning forward

    Thanks everybody for responding so quick, I found that several states publish their construction specs for public works online. The consensus seems to be 1/2" - 3/4" out of plumb in 10' vertical is acceptable. cvg and hokie66 are both correct, we did find that the reinforcing was on the wrong...
  2. nmdeveloper

    CMU Retaining Wall leaning forward

    I'm investigating a wall that is approximately 300' long and 10' high. the wall is leaning out away from the retaining side by 1/2" - 2 1/4" inches. The contractor is claiming that 2" out of plumb in 10' vertical is an acceptable industry standard (this is in New Mexico, bear with me) my...
  3. nmdeveloper

    How to counteract soil creep?

    I'm investigating a retaining wall that was leaning 1/2" to 2" out of plumb in 10' vertically. The wall was leaning away from the retaining side. does anyone know of a published specification regarding the allowable tolerances for plumb? In my opinion its 0, however it's been difficult to find...