Thanks for the reply.
What if:
My building is fully sprinklered, and has only one standpipe that feeds 4 outlets all on the HMD floor. Do I have to flow all 4 at 250gpm?
My building is fully sprinklered, and has only one standpipe that feeds 4 hose outlets, one at each floor. Do I have to flow...