    As & Hg & total sulfur removal

    Thank you Epoisses ,I check Axen Catalog ,They have two diffrent beds gaurds for Hg & As . In US patent 4962272 ,lead oxide catalyst have been recomended for COS & As.Are you know any company to produce the catalyst? JGC & UOP has a process for removeing Hg & As.Is there any one has detail...
  2. MT47

    As & Hg & total sulfur removal

    Hi,I have BIG PROBLEM: My question is related to As & Hg & total sulfur removal from ethane gas. Ethane Feed has above impurity and should be routed to Olefin plant (the feed flow rate is 180,000Kg/hr), therefore all impurity should be removal before the plant.I know they should be removed by...
  3. MT47

    Reaction rate of caustic with CO2

    HI I am going to design a caustic wash tower in ehtylene plant.Is there any one help me to find kenetic formula of the reaction between CO2 and NAOH. Thank you
  4. MT47

    Abbreviation of component

    Hi,Please help me.My question is related to following abbreviation: 6N6,5N10,mbP7 and sbP7. Are there any boady know what is the above component for each abbreviation? Best regards
  5. MT47

    Weir installation on sea water network

    Joerd,thanks for replying to me. There is one point for me.where the return line should be connected ,inlet or outlet of heat exchanger,I think to outlet line of heat exchanger.In this case it seams pressure drop of back pressure valve should be considered 1 bar.Please clarify.What is...
  6. MT47

    Weir installation on sea water network

    Hi Is there any one to has experience of weir installation citeria on sea water net work,my means when weir should be installed in ney work? and is it possible to consider vacuume breaker instead of weir? I will be thanks to reply me as soon as possible. Best regards
  7. MT47

    Ice formation tempreature

    Hi zoobie and pmover thank you and i am sorry i couldn't describe my problem.I have two problems.first,Hydrate formation or freezing on tray and second hydrate formation in cold box. pmover i confirm you that the wet feed is natural gas but the feed enter to De-ethanizer not De-methanizer...
  8. MT47

    Ice formation tempreature

    Zoobie ,Thank you to response me. My problem related to hydrate formation in low temp.( -12'c top of de-ethanizer tower).The plant feed is wet but two dryers(one work & one regeneration with 12hour cycle) and one moisutre analyzer had considered before tower .but If the dryer couldn't work true...
  9. MT47

    Ice formation tempreature

    I must evaluate ice formation possibility in de-ethanizer tower.Could any one to help me to find ice formation tempreature in 18.7 kg/cm2g.I will be thanks.
  10. MT47

    Ethylene glycol consumption

    Thank you from everyone to replay me. TDK2 has true idea about the indirected fire heater system. I want to determine the volume of ethylen glycol as one of the chemical for the proposal step ,there for in need to estimation of chemical consumption ,but i couldn't find vendor or a good vendor...
  11. MT47

    Ethylene glycol consumption

    Salty crude should be heated before desalting unit up to 69'C .Indirect fired heater is used as crude heater.The bath of the heater is water- ehylene glycol(50%). I need to estimate the value of ethyene glycol as bath in start-up and losses during normal operation. Is there design criteria for...
  12. MT47

    Ethylene glycol consumption

    My mean is Ethylen glycol for start-up and losses during operation. Thank you
  13. MT47

    Ethylene glycol consumption

    Hi Please help me: I want to estimate ethylene glycol (50%) consumption for indirect fire heater.Design duty of fire heater is 19.2 MMBtu/hr.Is there any one to help me for calculation? thank you .
  14. MT47

    Stack lenght

    Hi,every body ,please help me. My question is about rough estimation for Stack lenght of fire heater that is used for pre-heating of crudeoil.Heater rating is 5320 KW. Thank you .
  15. MT47

    Control valve selection for pipeline

    Dear David thank you for your attention in this matter.you see The objective of the control of crude oil pipeline pump system is two folds:to keep the discharge below the maximum pressure for which the pipe is rated and to prevent the suction pressure from dropping below thw net positive...