centondollar, thank you for the reply. We are not concerned with the functionality of the cables as the lines that want to be moved will be designed in accordance with the relevant code (NESC). My concern is how the structure will react if the currently de-energized lines are removed. In...
I have an existing structure located at an electrical substation that currently has several transmission lines terminating on it. The local utility would like to modify the locations of the lines, requiring me to run some structure checks. My question is, would the load from the tensioned...