Thank you for your comments,
For your information the 87T (Harmonic restrained percentage differencial function) operated on the feeder fault.
We are still looking at this problem.
I will post the result when we figure out this problem.
Any comments on ABB TPU 2000R application, problems or anything. ( Had a problem whith TPU 2000R operated on the feeder fault, tripped the transformer (230KV/27.6KV, 125MVA), dual winding.
there is also SEL 387 as a backup which did not operate.
Thanks,
mntg (Visitor) May 13, 2002
can someone tell me more about a Tx vault installation (3phase bank 3x500kva Wye-Wye. How is a neutral tied to ground on primary (H2) and secondary side (X2).
thanks
can someone tell me more about a Tx vault installation (3phase bank 3x500kva Wye-Wye.How is a neutral tied to ground on primary (H2) and secondary side (X2).