The drawing does not specify the requirements but there is a contractual requirement for how equipment get tagged. This is in fact why the equipment was re-tagged.
A change in requirements caused a vessel to be re Tagged. There has been some discussion as to whether or not this constitutes an engineering change. My feeling is that it is a drawing change and the revision is for the drawing regardless of the content. So, any change to the drawing...