Recent content by march1971

  1. march1971

    TITANIUM AND CARBON STEEL GALVANIC CELL

    There will no galvanic corrosion problem so long as there is no gap for water or moisture ingress.
  2. march1971

    self stress relief?

    I think that the problem with this has to do with expansion and contraction that accompany temprature changes in a material. I agree that the material is thin but one have to understand that the rivet is a type of joint whereby two separate parts are held together by a clamp-like component or...
  3. march1971

    about manufacturer's tolerance of the wall thickness of pipes,fitting

    The following may be the reason: (1)Most pipe specs, ASME B16 in particular, give a manufacturing tolerance of +/- 12.5% (2) It coud also be that you did not identify the schedule of the pipe correctly. (3) Most impotantly, the calibration of the tool used in carrying out the measurement might...
  4. march1971

    ASME B31.3 Pressure Vessel?

    B31.3 is specifically for process piping and should not be used for pressure vessel even if the vessel is as small as a pipe.
  5. march1971

    8" x 3 km Flowline Intelligent Pigging

    We just completed the IP of an 8" x 3km gas flowline that was installed in 1987. This line has an external bullet ponit defect measuring 16mm long x 11mm wide x 5mm deep at 3 O'clock position with the bultt in place and is a schedule 100 pipe with Nominal wall thickness of 15.1mm. The final IP...
  6. march1971

    8" X 3 Km Gas Flowline Intelligent Pigging

    We just concluded the intelligent pigging of an 8"x3km gas flowline that was installed in 1987 but the final IP report from the contractor revealed no defect. This line is a schedule 100 pipe with Nominal wall thickness of about 15.1mm and has a bullet pierce of 16mm length x 11mm width x 5mm...
  7. march1971

    Hastalloy, Monel and Inconel Properties.

    Hi cooleagues, I had a proposal to use the alloys in our company but do not have a full grasp of their corrosion properties, chemical composition and application. I will obliged if you could educate me on the above and sent web links where I can get more idea. Thanks March 1971
  8. march1971

    Piping Retirement Critera.

    I am incharge of asset intergrity in my place of work and is saddled with the role of determining facilities retirement. I would be obliged if some one can give me guide on the critera to used in taking decision on the above matter. The piping in question are crude oil and gas production piping...
  9. march1971

    Sour Service

    A corrosive environment said to be sour if H2S(hydrogen sulphide) is present in that environment. If there is none,the environment is not sour. In other to determine the corrosivity of the flüid in a vessel a knowledge the % composition of the vessel's content is required.The following...
  10. march1971

    Pipeline Cathodic Protection

    Think these contributions are enough for you as mine will be a repetition of the things already said. So combine these fragments of Knowledge and it will make the good volume of knowledge you require. If you are not satisfied write back so that I can give you more infomation.
  11. march1971

    Relationship between pressure and thickness

    desertfox is right, there is need for you to give mor details so that useful solutions can be profered.
  12. march1971

    Risk Based Inspection.

    I am presently faced with a new challenge of taking charge of the risk based inspection of the surface facilities in my company's crude oil flowstations. Please I will be obliged if someone can give me guidelines on the above subject matter or give link on where to find information on the above...
  13. march1971

    Implosion of Pressure Vessels.

    Thank you all. Grateful for your information. Thanks, March1971
  14. march1971

    Implosion of Pressure Vessels.

    During the process of start-up of one of our flowstations,while pumping down the high liquid level from a vertical crude oil surge vessel with two pumps, the vessel suddenly imploded. All pumps were immediately stopped, facility closed in and wells secured. Pleases what colud be the...
  15. march1971

    Minimum design metal temperature

    I think visiting this site can be beneficial to you: www.key-to-steel.com/Article/Art61.htm