  1. LCid

    Reading Watermain Designs

    I think it's as follows, F= Flange, H=hub; Mech CPLG 150= mechanical coupling; I'm not sure about the 150.
  2. LCid

    in-city excavation

    Thank you all.
  3. LCid

    in-city excavation

    Looking for a definition of "mass excavation" within the context of an infrastructure project in highly urbanized city.
  4. LCid

    Encasing water main in concrete

    bimr, The pipes are located in a street, with heavy traffic; cross each other at an intersection; both are steel, 48-inch in diameter; clearance between the mains will be 12" or greater. About 30 feet of the bottom main are to be encase in concrete (wire mesh + 8" concrete all around)...
  5. LCid

    Encasing water main in concrete

    Both mains are clean water.
  6. LCid

    Encasing water main in concrete

    What would be the main reason(s) for encasing in concrete a 48-inch steel main crossing perpendicularly under another 48-inch steel main? The main is to be encased even if the specified minimum (12") clearance between the mains is achieved.
  7. LCid

    Trunk water mains

    I also agree with coloeng. But if an approval order is to follow: geometry; shop drawings; laying schedule, sounds practical.
  8. LCid

    Trunk water mains

    I confess to be at a loss with your answer. The question is, and I apologize if it was not clearly understood, after the geometry, what comes next? the laying schedule or the shop drawings. I've read specs. that indicated that the laying schedule follows the geometry, then shop drawings come...
  9. LCid

    Trunk water mains

    I have seen conflicting specifications regarding whether shop drawings or laying schedules follow the approved geometry drawings of trunk water mains. Any thoughts on this?
  10. LCid

    sewer influence lines

    I'm looking for a concise definition of "sewer influence lines" . How are the influence lines determined/specified?
  11. LCid

    Bridge hardening_definition_general concept

    Qshake-thank you for your post.
  12. LCid

    Bridge hardening_definition_general concept

    What would be the best, concise definition of "bridge hardening"? Or, in other words, when used in general terms what is "bridge hardening". Though a civil engineer, this not my field. Thank you.
  13. LCid

    Catch basin-freeboard-concept

    diggerman, You are stating a definition of "freeboard." That, can be found easily. The "understanding" of freeboard is what has been discussed here in the context that was used (see above),in the language quoted from an RFP. Also see the attached image. What is your understanding? On a...
  14. LCid

    Double arrangement/48-inch butterfly valves

    bimr, Your first thought was correct--the valves are (proposed the work has not been done yet) in series. The pipe runs east-west. The valves are installed close to each other, a few feet away (I only saw a rough drawing). There are two shaft connections (coming out of the same shaft); one...
  15. LCid

    Double arrangement/48-inch butterfly valves

    I think that the reason for the 2-valve arrangement is operational safety, redundancy for the system. If only one (1) valve is installed and that valve needs to be serviced/repaired a large section of the system is affected. The "bigger picture" here is that the arrangement is large (48-inch)...